PROJECT: Two laboratories for analysis and testing for the development of the gas pipeline project.

PROBLEM: Requirement for an integrated project with two week timeline for execution and operation

SOLUTION: 2 modules, 15m2 each were installed, fully equipped with office furniture and air conditioning, in addition to integrated services. The modules were located next to the operation and could be relocated when necessary.

PROJECT TIME: 1 week.

PROJECT ADDRESS: Puerto Industrial, Altamira, Tamaulipas.