PROJECT: 3,120m2.

PROBLEM: A full turn-key project was required in 14 weeks of time, but the execution permits and the security of the unit were an impediment.

SOLUTION: Modulbox was able to carry out in 6 weeks, the transfer and assembly of modules, of fully equipped prefabricated offices, with complete furniture, to provide the staff with the space necessary as required by the customer.

BENEFIT: The client was able to use the modular system in a timely manner, starting operations without impediments.