PROJECT: Modular camp for the development of gas pipeline project.

PROBLEM: A fully integrated project in 10 weeks was required.

SOLUTION: 1,560m2 of fully equipped areas were installed, with air conditioning, fully furnished with custom furniture, lockers and complementary integrated services.

PROJECT TIME: 10 weeks.

PROJECT ADDRESS: Puerto Industrial Camp, Altamira, Tamaulipas.

 

transcanada 4
transcanada 2
transcanada 6
transcanada 5
transcanada 3
transcanada