PROJECT: Modular camp for the development of gas pipeline project.
PROBLEM: A fully integrated project in 10 weeks was required.
SOLUTION: 1,560m2 of fully equipped areas were installed, with air conditioning, fully furnished with custom furniture, lockers and complementary integrated services.
PROJECT TIME: 10 weeks.
PROJECT ADDRESS: Puerto Industrial Camp, Altamira, Tamaulipas.